Terminal Inventory

  • 5 x 5t Forklift
  • 1 x 5.5t Forklift
  • 2 x 7t Forklift
  • 1 x 10t Forklift
  • 3 x 16t Forklift
  • 1 x 18t Forklift
  • 1 x 32t Forklift
  • 2 x 3t paper clamps
  • 4 x complete bagging machine 25/50 kg sets
  • 3 x mechanical grabs
  • 2 x mafi trailers
  • Various sized Gen sets from 30 – 500kva
  • 2 x bagging machine 1000kg/1 metric ton

All the above plants and equipment are maintained and operated by our in-house maintenance department and operators.

ABOUT JPS

JPS is one of the leading terminals in Nigeria, with three berths totaling 484 meters in length. Josepdam Port Services is the terminal operator of Tincan terminal A, that was successful in 2006 to gain the concession agreement with Nigerian Ports Authority.